Case ID (from Final Report)

Mixing Time (Hrs)

Mixing Time (Okita Units)

A.1 Sq-no pillars; simultaneous fill/draw; Inlet Off-Center on Sidewall

5.0

2.0

A.2 Sq-3 pillars; simultaneous fill/draw; Inlet Off-Center on Sidewall

5.5

2.8

A.3 Sq-100 pillars; simultaneous fill/draw; Inlet Off-Center on Sidewall

9.2

4.6

B.1 Sq-100 pillars; fill; Inlet Off-Center on Sidewall

9.2

4.6

B.1 Sq-no pillars; fill, Inlet at Center of Sidewall

3.0

1.5

C.1 EBMUD, Cyl-Warm; Edge Inlet; fill

6.3

1.5

C.2 EBMUD, Cyl-Cool; Edge Inlet; fill

5.8

1.4

C.3 EBMUD, Cyl-Isothermal; Edge Inlet; fill

6.3

1.5

D.1 Cyl-Warm; Off-Center Inlet; fill

6.7

1.8

D.2 Cyl-Cool; Off-Center Inlet; fill

8.6

2.3

D.3 Cyl-Isothermal; Off-Center Inlet; fill

8.6

2.3

E.1 Cyl-Warm; Center Inlet; fill

4.8

1.3

E.2 Cyl-Warmer; Center Inlet; fill

4.8

1.3

E.3 Cyl-Isothermal; Center Inlet; fill

3.6

1.0

F.1 Ed Heck, Azusa, Cyl-Isothermal: Tangential Inlet; simultaneous fill/draw

10.3

4.7

G.1 Brentwood, Baseline Baffle Wall; fill, draw, fill, draw

23.1

6.2

G.2 Brentwood, Baffle Wall with 3 Gaps Wall; fill, draw, fill, draw

12.8

3.5

 